19th January 2014
This is the scene at Taunton which greeted passengers on Sunday 19th January 2014 at the start of the two week long engineering blockade at multiple sites between Taunton and Exeter. The engineering works have been nearly 2-3 years in the planning to provide a large upgrade plan at multiple locations. On Sunday 19th January 2014 Freightliner Class 66/5 No.66518 is pictured at Taunton on the 6A02 12:55 Taunton - Westbury engineers. The Taunton worksite was one of the rare occasions where passengers were able to see the track replacement works being carried out as their alighted and boarded their services at Taunton.
(Photo: Brian Garrett)
|
|
|
19th January 2014
Freightliner Class 66 No.66518 is pictured at Taunton on the 19th January 2014 reading to leave the engineering worksite as 6A02 12:55 Taunton - Westbury engineers.